What is TruNet Solar?

TruNet Solar is OUC’s net metering program. Customers whose rooftop systems were connected – or had approved interconnection applications – on or before June 30, 2025, will continue receiving the full retail rate through June 30, 2045.

Customers interconnected on or after July 1, 2025, will receive credits at the Community Solar Energy rate for five years, through June 30, 2030, and then at the Retail Levelized Fuel rate. During a temporary grace period through October 31, 2026, these customers will receive the full retail rate.

On November 1, OUC retired the solar bank. Under TruNet Solar, excess energy sold to OUC is credited to a customer’s account immediately, helping reduce electric and water charges within the same billing period. Any remaining monetary credits roll over to the next billing period.

Before this change took effect, OUC completed a final true-up of each customer’s solar bank and apply the remaining balance to their account.

For more information on OUC’s electric rates, click here. To view a virtual walkthrough of a sample TruNet Solar bill, click here.

ON OR BEFORE JUNE 30, 2025

Completed/Paid Application Received by OUCEffective Date of RatesApplicable Kilowatt-hour (kWh) Credit Rate for Exported Energy*
June 30, 2025June 30, 2025 – June 30, 2045Full Retail Rate

ON OR AFTER JULY 1, 2025

Completed/Paid (if applicable) Application Received by OUC or Change in Account HolderEffective Date of RatesApplicable Kilowatt-hour (kWh) Credit Rate for Exported Energy*
July 1, 2025 or laterJuly 1, 2025 – Fall 2026Full Retail Rate during temporary grace period for all solar customers
July 1, 2025 or laterFall 2026 – June 30, 2030Community Solar Energy Rate
July 1, 2025 or laterJuly 1, 2030 – thereafterRetail Levelized Fuel Rate

*Rates subject to change

Frequently Asked Questions – TruNet

What is Trunet?

TruNet Solar is OUC’s net metering program. Customers whose rooftop systems were connected before June 30, 2025, or whose interconnection applications were approved by that date, will continue receiving the full retail rate through June 30, 2045.

Customers who complete their solar interconnection after June 30, 2025, will receive credits at the community solar energy rate for five years, through June 30, 2030, and at the retail levelized fuel rate after that. During a temporary grace period through October 31, 2026, these customers received the full retail rate.

Why is OUC changing net metering?

TruNet is intended to “true up” the price of solar so net metering rates more accurately reflect the costs associated with maintaining grid infrastructure and storing and transmitting electricity.

I’m an existing rooftop solar customer. How long will I be grandfathered in with the current net metering rate?

Customers whose rooftop systems were connected before June 30, 2025, or whose interconnection applications were approved by that date, will continue receiving the full retail rate through June 30, 2045.

I’m currently billed under a grandfathered solar rate plan. If I add more solar panels, will I lose my grandfathered status?

An add-on solar PV system will not affect the grandfathered status of an account and will be billed under the same rate plan as the original installation.

Can I still apply to be grandfathered in at the existing solar retail rate?

The deadline to be grandfathered as an existing solar customer was June 30, 2025.

What if I want to sell or rent my home?

The Solar Interconnection Agreement remains on file for the premises in OUC’s billing system. If you sell or rent your home, the new owner or tenant will need to contact OUC to either establish a new OUC electric account or transfer an existing one to the new premises. Their compensation rate for excess energy will be based on the rate in effect on the date when the new or transferred account is activated.

if I move, will the new homeowner be grandfathered?

If you sold your home and the new homeowner took possession and established an OUC electric account by June 30, 2025, the new homeowner will receive the full retail rate for excess energy sold to OUC through June 30, 2045.

For homes sold after June 30, 2025, the new homeowner will not be grandfathered. They will receive the community solar energy for excess energy sold to OUC through June 30, 2030, and at the retail levelized fuel rate after that.

What if I move from one home with solar to another?

If you purchased a new home with existing solar and took possession and established or transferred an OUC electric account by June 30, 2025, you will receive the full retail rate for excess energy sold to OUC through June 30, 2045.

If you purchase a new home with existing solar, and took possession on or after July 1, 2025, you will receive the community solar energy rate for excess energy sold to OUC through June 30, 2030.

Our OUC bill is under my spouse’s name. Will the grandfathered rate pass to me should my spouse become incapacitated or pass away?

Yes, this will be treated in the same manner as transferring an account to the surviving spouse.

Are there any costs to apply for a solar interconnection?

Current fees are based on the array’s gross power rating, as measured in alternating current (AC), installed on a customer’s premises:

  • Tier 1: 0 – 10 kW – No fee
  • Tier 2:  >10 kW – 100 kW – $340
  • Tier 3:  >100 kW – 2,000 kW (2 MW) – $1,300

Solar interconnection fees may be paid online through OUC’s credit card portal, Bill2Pay. Credit card payments are typically processed within five (5) business days.  Below are applicable fees assessed for use of OUC’s credit card portal:

  • $5 – Payments under $1,000
  • $10 – Payments over $1,000

Payments by check may take up to two weeks for processing once received. A $25 fee will be assessed for payments returned due to insufficient funds.

What requirements does my rooftop system need to meet for approval?

Applications for solar or solar plus battery storage must be located at the residence identified in the application. The capacity of the system should not exceed the needed energy requirements for the home.

If I produce excess energy, will I receive bill credits and be allowed to use those to pay my OUC bill?

Yes, a customer is billed for energy consumed from OUC and credited on that same month’s electric bill for any energy exported to the grid. If the credit for exported energy exceeds the cost of energy consumed, any remaining credit is applied to the outstanding balance on the bill.

If I produce excess energy, will any “bill credits” be rolled over to the next month so I can use them?

Before November 1, 2026
A customer is billed for the net difference between the kWh consumed from OUC and the kWh exported to the grid. If the kWh exported exceeds the kWh consumed, resulting in a net credit, the corresponding dollar value is credited to the customer’s solar bank.

On or After November 1, 2026
If a customer generates a credit and a balance remains after all applicable charges are covered, the monetary credit will remain on the account and carry forward to future bills.

If I produce excess energy, will OUC continue to true-up my account at the end of the year and send payment to me if I produce more energy than I consume?

Before November 1, 2026
OUC performed an annual “true-up” of the solar bank in December 2025. Any remaining balance in the solar bank was applied as a credit to the customer’s account. This credit remained on the account and was applied toward future monthly charges, including consumption and applicable fees.

OUC completed a final true-up of your solar bank prior to implementing TruNet Solar billing changes and applied any remaining balance to your account.

On or After November 1, 2026
OUC credits the customer for generation the month the generated energy is received. No additional true-ups will be necessary going forward.

What are the requirements to submit a solar interconnection application?

Solar applications and supporting documentation must be submitted through OUC’s online rebate portal. Mailed or e-mailed applications will not be accepted.

Solar interconnection payments may be made online. To be eligible for the full retail rate, payment along with the completed solar interconnection application must be received by June 30, 2025.

Required Documents for Submission:

  • Passed City/County Permit Inspection or Certificate of Completion
  • Proof of Solar System Purchase (itemized invoice signed by customer)
  • Electrical One-Line Diagram (must include the seal & signature of a licensed professional engineer)
  • Proof of insurance (only Tier 2 and Tier 3 applications)

Download our step-by-step guide to submitting a solar interconnection application.

Related Content

Service Rates & Costs

OUC offers transparent utility rates and costs. View our electric rates, water rates and more to better understand your billing and options.

Understanding My Bill

Our sample bill can help explain all the details on your utility bill, so you know exactly what you’re paying for every month.

Solar Battery Storage

Battery Storage Rebate

Get up to $2,000 as a credit on your bill when you supply your property with power regardless of the weather or the time of day.

Share Feedback