Contractor Thermal Checklist

OUC's Residential Solar Thermal Program participation recommends all residential solar thermal systems be installed by an OUC Preferred Solar Contractor. To become a Solar Preferred Contractor, please contact pcn@ouc.com or to learn more, visit the Preferred Contractor Network (PCN).

Solar Contractor Checklist for Thermal Systems and Supporting Documentation

  • Provide quote/proposal to the customer.

  • Assist customer in submitting the required paperwork to OUC. To see paperwork required, visit the “How to Apply for Your Home” or "How to Apply for Your Business" sections of this site.

  • Pull required permits from designated jurisdiction.

  • Complete final permit inspection with designated jurisdiction.

  • OUC completed and approved the solar system inspection.